Week 2 is wrapped up (this post is coming a couple of days late – my apologies).  The crews from Pitt Electric and Jeff Haddock Plumbing worked hard all week.  A lot of electrical lines and outlets have been installed.  The plumbing crew dug trenches, installed the sewer lines, PASSED INSPECTION, and then re-filled the trenches and tamped the dirt back in.  Week 3 will include pouring concrete over those trenches, and then we’ll start framing in walls!

 