Week 2 is wrapped up (this post is coming a couple of days late – my apologies). The crews from Pitt Electric and Jeff Haddock Plumbing worked hard all week. A lot of electrical lines and outlets have been installed. The plumbing crew dug trenches, installed the sewer lines, PASSED INSPECTION, and then re-filled the trenches and tamped the dirt back in. Week 3 will include pouring concrete over those trenches, and then we’ll start framing in walls!
End of the week:
Be sure to check us out on Facebook, Instagram, and Twitter, and keep following our progress at Magnolia Grace Animal Hospital!