Week 10 – Oxygen and Plumbing

Thankfully work was able to pick back up this week!  After the slowdown we experienced last week, we made up some ground.  This week we got some of our plumbing fixtures finished, ALL of the mechanical for the HVAC is done, most of the light switches were added, the reception desk has been getting wired up, and all of the piping was put in for our oxygen system! Check out the pictures below:

As always, thanks so much for following along!